• Hello Guest, welcome to the initial stages of our new platform!
    You can find some additional information about where we are in the process of migrating the board and setting up our new software here

    Thank you for being a part of our community!

Pdx dl

Plus T plan

January

Clean replacement M47, check shifter pins.
Pick up B21FT (IPD turbo cam, head milled .020?, compression +/- 8.5 : 1).
Install wide band bung on TME down pipe (?).Take TME header with ATP waste gate to shop to have a temporary header made (?).
Install turbo, etc.
Resurface flywheel, replace clutch (factory turbo)?

February

Pull 230 engine
Install firewall heat shield, diverter valve, ATP waste gate with 3? down pipe, heat tape.
Remove Chrysler box, install 541, distributor and spark plugs.
Oil pressure sending unit (gauge and light).
Install engine
Install ProVent.
Cone filter and suction pipe. SiliconeIntakes.com (2.5? plus 1? T for BOV). Air flow meter to suction side. Yoshi boost adjuster.
Spark plug wires insulators
Install shifter foam and back-up light wiring.
Install cooling units (oil / water).
Install fuel rail, 3.0 bar FPR and 850 injectors.
Hook up gauges (boost, oil pressure, wide band).

March

Dyno

April

Davis
 
I manual swapped my car on a weekend and rebuilt and installed a new engine in 2 months. This is basic bitch level work :cameron:

Carl, I give you 2 weekends to pull this off.

Yeah well, I blew my engine up, swapped in another, blew that one up, rebuilt the first one, swapped that in, all in about 2 months.

:cameron:
 
th
 
Back
Top